| Previous Clients |
LM Wind Power |  | |
Design, Manufacture and Testing of Blades for Wind Turbines | |
| |
To facilitate the implementation of ISO17025 in the Assurance Engineering (Blade Testing) department in Denmark and India
To also introduce the concept of FMEA and provide training and support as required | |
| |
Lean Horizons LLC |  | |
Management Consultancy | |
| |
To
supply expertise and training in Production Part Approval Process
(PPAP) and related automotive technologies to their client's suppliers | |
| | |
Wipac Ltd |
| |
Design and Manufacture of Lighting Units for Prestige Automotive Vehicle Manufacturers (Automotive Tier 1) | |
| | |
Responsible
for interim Quality Management and process improvement for the
manufacture of LED headlamps for the 2010 Bugatti Veyron
Compilation
of PPAP Packs and provision of Quality Support to the Production
Readiness Team for all external lighting units featured on the 2011
Lamborghini Murcielago | |
| | |
Alu+ Ltd |
 | |
Manufacturer of Aluminium Louvres and Ventilation Systems
(Products for the Building Industry) | |
| | |
Successful
implementation of ISO9001:2008 The complete system was implemented by
DGX, modifying existing procedures wherever possible. This minimised
disruption to the day to day running of the company and gave them a
Quality Management System tailor-made to suit their business. | |
| | |
| HBPO (UK) Ltd |
 | |
Manufacturer of Vehicle Front End Modules and Radiator Assemblies
(Automotive Tier 1) | |
| | |
Customer
Liaison Engineer, based at Jaguar Castle Bromwich, tasked with ensuring
that all delivery and quality issues were dealt with efficiently and
effectively during the product introduction period. HPBO were a new
supplier to Jaguar, and their introduction to the supplier base
coincided with a suite of new designs for the full range of vehicles.
The task was to sequentially deliver 500 defect-free units into Jaguar at full production speed (A "500 Car Challenge")
It was achieved with minimal disruption to Jaguar and helped HPBO Ltd to forge strong links with their new customer contacts | |
| | |
| Faurecia Banbury |
 | |
Manufacturer of Vehicle Seating
(Automotive Tier 1) | |
| | |
Supplier Quality Assurance (SQA) Engineer for all safety critical components (Metal Frame Components; Fabrics; Airbags, etc).
Work
included proactive supplier visits throughout Eastern and Western
Europe; Analysis of PPAP documentation; Raising of 8Ds; Subsequent
Assessment of Supplier Responses etc
Successfully reduced PPM by 80% on at least 2x Problem Suppliers | |
| | |
| Brose Ltd |
 | |
Manufacturer of Vehicle Components and Assemblies
(Automotive Tier 1 & 2) | |
| | |
| Took
responsibility for Manufacturing Quality of the assembly of vehicle
window regulators. Recovered the number of outstanding customer
concerns to manageable levels and restored the customer’s confidence
As
a result of this success, the contract was extended to take
responsibility for Manufacturing Quality of the assembly of seat frames
By
identifying and introducing Process Improvements, significant
reductions were made on the numbers of customer issues to the extent
that the role was further developed to cover Field Warranty Analysis | |
| | |
| Johnson Controls |
 | |
Manufacturer of Vehicle Interior Assemblies
(Automotive Tier 1 & 2) | |
| | |
| Brought
into the team to improve product quality and keep scrap/reject costs at
manageable levels following the decision to close the factory and
relocate production to another Johnson Controls facility. | |
| | |
| UEES Ltd |
 | |
Manufacturer of Vehicle Exhaust Systems and Fuel Tanks
(Automotive Tier 1) | |
| | |
| Lead
Project Quality Engineer for the introduction of the manufacturing
lines for the Range Rover and Lotus Elise Exhaust Systems. Work
featured adhering to APQP requirements including agreeing standards
with the customer; preparation of PPAP Submission Documents; and
defining sub-supplier requirements. Project successfully completed
within time and budget with no disruption to existing production
Implemented
and maintained the company’s ISO/TS16949; QS9000 and ISO9001
accreditations and prepared the company’s successful application for
Ford Q1 Status | |
| | |
| |
About DGX | Services Offered | Qualifications |CV Download
Previous Clients | FAQs | News | Links
| |
Copyright DGX Management Services Ltd
Company Reg No: 5549899 | |